What the test involves
The sequence we run for UN/DOT IBC Performance Test. Exact parameters are confirmed against the current revision of the standard before testing begins.
01
Test plan and IBC design review
02
UN specification marking verification
03
IBC drop test
04
Stacking test
05
Leakproofness test
06
Hydrostatic pressure test
07
Vibration test
08
UN test report and certification package
What to send us
4 complete packaged samples, assembled exactly as they ship.
Design drawings or a packaging specification, if you have them.
The Safety Data Sheet — required before regulated testing can begin.
Ship to 9708 Industrial Drive, Bridgeview, Illinois 60455.
Not sure the count is right for your configuration? We confirm it with you before you ship anything.
This certification expires
UN/DOT IBC Performance Test is normally re-tested every 24 months, and sooner if the packaging changes. We keep track of when your testing comes due and tell you before it lapses — you should not find out from a rejected shipment.
Common questions
Can you handle a full-size IBC?
Yes. Our vibration table is rated to 2,000 lb and we handle IBCs, drums, pallet loads and large crates with in-house material handling.
Not certain UN/DOT IBC Performance Test is the right test?
Answer a few questions about what you ship and we will tell you which standard applies — and why the others do not.