SAMPLES NEEDED
1 complete units
TYPICAL TURNAROUND
3-7 days
You probably need this if
A customer/supplier specification or a regulatory submission names D4169
You are validating packaging for medical devices or other regulated products
You need testing matched to a specific route: LTL, truckload, rail, air or export
What the test involves
Samples are first conditioned. They then go through each hazard in the order the distribution cycle sets. The same samples stay sealed through the whole sequence, and most cycles begin and end with a handling sequence, just as real shipments are handled at loading and at delivery. Afterwards the product and package are inspected against the acceptance criteria. The report records the cycle, assurance level, conditioning, test plan and the condition of every sample.
01
Choose a Distribution Cycle (DC)
The standard defines 18 cycles that describe how a product moves. They range from a general cycle for unknown routes (DC-1) to specific ones such as single packages by LTL freight (DC-3), unitized truckload freight (DC-6), air plus local truck (DC-12 and DC-13), and government shipments (DC-18), or customized plans based on shipping data
02
Choose an Assurance Level
Level I is the most severe and Level III the least. Level II is the usual default. The level sets drop heights, compression loads and vibration intensity.
03
Define an Acceptance Criteria
You decide in advance what counts as a pass / fail
04
Testing typically starts with conditioning
05
Various tests depending on distribution cycle - can including drops, compression, vibration, altitude, and environmental testing
06
Test report
What to send us
1 complete packaged samples, assembled exactly as they ship.
Design drawings or a packaging specification, if you have them.
Ship to 9708 Industrial Drive, Bridgeview, Illinois 60455.
Not sure the count is right for your configuration? We confirm it with you before you ship anything.
Common questions
Which distribution cycle should I use?
The one that most closely matches how your product ships. If your specification names a cycle, we test to it. If not, we can help you determine the best fit
Is ASTM D4169 the same as ISTA testing?
No. Both simulate distribution, but ISTA procedures such as 3A and 3E set the sequence for you, while D4169 builds the plan from the cycle and severity you select. Gaynes runs both.
How much does ASTM D4169 testing cost?
It depends based on the distribution cycle, conditioning, etc. Give us a call and we can quickly provide a quote for how much testing will cost.
Not certain ASTM D4169 is the right test?
Send us an email, give us a call, or schedule time to chat. We can answer your questions and let you know which standard applies for your situation.
