SAMPLES NEEDED
3 complete units
LAB TIME
4 business days
TYPICAL TURNAROUND
1-7 days
RE-TESTING
Not on a fixed cycle
You probably need this if
A customer specification or a regulatory submission names D4169
You are validating medical device packaging
What the test involves
The sequence we run for ASTM D4169. Exact parameters are confirmed against the current revision of the standard before testing begins.
01
Distribution cycle and assurance level selection
02
Atmospheric preconditioning
03
Compression per assurance level
04
Random vibration
05
Drop sequence
06
Test report
What to send us
3 complete packaged samples, assembled exactly as they ship.
Design drawings or a packaging specification, if you have them.
Ship to 9708 Industrial Drive, Bridgeview, Illinois 60455.
Not sure the count is right for your configuration? We confirm it with you before you ship anything.
Common questions
Which distribution cycle should I use?
D4169 defines a number of cycles and three assurance levels, and scope moves materially with the choice. It normally comes from your specification or your customer - send it and we will scope against it.
Not certain ASTM D4169 is the right test?
Answer a few questions about what you ship and we will tell you which standard applies — and why the others do not.
